Content written by Mick the Builder

Footing systems

Footing systems

Using Fill
When preparing for a flat base to construct a footing system on.  Sometimes it is necessary to import the fill to get the base level up to the required height.
In this case, a non-cranial fill must be used, such as crushed rock ,stone dust sand, or any other non-granules fill, which is available.  non-cranial fill means a soil that will  not react with moisture .In some cases filll that you have used a need to be controlled and compacted at every 100mm layers before construction of slab can take place with a wacker packer or heavy roller.
Truck loads of fill will be delivered to site and spread around with a bob cat.
 

"If you need a lot of fill it is probably best to contct a quarry rather than a soil yard"